News detail

Work Safety Month|Emergency drills, take precautions

In order to implement the policy of “safety first, prevention first, comprehensive management, and full participation”, we will further improve the company’s emergency management system for work safety accidents, and form an emergency system with unified leadership, timely response, scientific decision-making, and orderly handling. Improve the company's ability to respond to unexpected production safety accidents, improve the overall level of emergency rescue work, and provide a safe and stable guarantee for the company's sustainable development. On the afternoon of June 20, Shandong Shengxing Chemical Co., Ltd. organized various units to conduct a simulated emergency drill on the leakage of D108 spherical tank in the storage and transportation workshop.

At 16:30 in the afternoon, the staff in the storage and transportation control room found that the combustible gas alarm in the spherical tank area alarmed and reported to the monitor immediately.

胜星集团有限责任公司

 

The shift leader and storage and transportation staff wore air calls to the site to check the specific situation and found that the flange of the D108 outlet pipeline was leaking. The shift leader reported to the fire brigade for assistance and pressed the on-site fire alarm. Then the shift leader reported the specific situation to the workshop director. The workshop director immediately reported to the company's vice president of production and notified the dispatch.

胜星集团有限责任公司

After the production dispatching notified each department to arrive at the scene, it announced the establishment of an emergency headquarters, each emergency team was in place, and the specific division of labor was arranged for each emergency team.

胜星集团有限责任公司

The emergency repair team is responsible for the on-site emergency repair work such as plugging and punching on the spot.

胜星集团有限责任公司

 

The alert evacuation team is responsible for on-site vehicle evacuation and on-site alert.

胜星集团有限责任公司

The fire rescue team is responsible for the fire sprinkler and the spray cooling of the surrounding tanks.

胜星集团有限责任公司

The production control group is responsible for the liquefied gas tank pour and water injection operations.

胜星集团有限责任公司

The environmental monitoring team is responsible for real-time monitoring of the quality of air and nearby water sources.

胜星集团有限责任公司

The material security team is responsible for providing emergency supplies.

胜星集团有限责任公司

After the drill was completed, each department reported the completion of the work. Xu Xinghai, vice president of production, Li Jinhua, vice president of technical equipment, and Liu Jinxiang, director of safety, commented on the situation on the spot, and proposed improvement measures for the problems that existed during the drill.

胜星集团有限责任公司

Through this emergency drill, the interactive and linkage capabilities of emergency response personnel in different positions were tested, and the operability, practicability and effectiveness of emergency plans of relevant units were tested. The entire drill was orderly, and the emergency response teams acted quickly and closely cooperated, and achieved the expected results, laying a solid foundation for the company's safety production management.