Shandong Shengxing Chemical Co., Ltd. 1.8 million tons/year hydrocracking project (Phase II) acceptance information announcement

1.8 million tons/year hydrocracking project of Shandong Shengxing Chemical Co., Ltd. (Phase II)

Acceptance information announcement

The site of the 1.8 million tons/year hydrocracking project (Phase II) is located at No. 1, Shengli Road, Dawang Economic Development Zone, Guangrao County, Dongying City, Shandong Province, within the existing plant of Shandong Shengxing Chemical Co., Ltd., and the specific geographic location is at 37°0′ north latitude 18", near 118°32'38.4" east longitude.

Shandong Shengxing Chemical Co., Ltd.'s 1.8 million tons/year hydrocracking project (Phase II) construction content: 1 set of 1.8 million tons/year hydrocracking unit, 1 set of 1.2 million tons/year reforming unit and 1 set of PSA hydrogen Concentration device, 1 set of 100,000 tons/year hydrogen sulfide recovery acid plant, desalinated water station, condensate station, reclaimed water reuse device, 13000m3 accident pool, dismantled the existing 60t/h acidic water stripping device and built it in the original location 1 set of 130t/h sour water stripping device, dismantling the existing 15t/h solvent regeneration device and constructing a 50t/h solvent regeneration device in the original location, etc. Due to the improvement of the raw materials of the plant project, the existing 60t/h sour water stripping device It can meet the needs of the existing, under construction and proposed projects in the plant area, so 130t/h acidic water stripping device is not to be built, which has been explained in the change report; the desalinated water station, condensate station, and reclaimed water reuse device are separately compiled Xing Chemical Co., Ltd. Reclaimed Water Reuse Device Environmental Impact Report Form", obtained the environmental assessment approval of the former Guangrao County Environmental Protection Bureau on March 1, 2017, the approval number is Guanghuan Jianshen [2017] 016, so this project is not Re-construction of desalinated water station, condensate station, and reclaimed water reuse device, the same construction project and this project at the same time acceptance.

In accordance with the relevant regulations in the “Regulations on Environmental Protection Management of Construction Projects” and the “Environmental Impact Assessment Law of the People’s Republic of China”, in July 2015, Shandong Shengxing Chemical Co., Ltd. commissioned Beijing Zhong’an Quality and Environmental Technology Evaluation Center Co., Ltd. to compile and complete the “Dongying "Environmental Impact Report of 1.8 million tons/year hydrocracking project of Shengxing Chemical Co., Ltd.". On August 13, 2015, Shandong Provincial Department of Environmental Protection approved the project with Lu Huanshen [2015] No. 200 "Approval of the Environmental Impact Report on the 1.8 million tons/year hydrocracking project of Dongying Shengxing Chemical Co., Ltd." .

In October 2015, Shandong Shengxing Chemical Co., Ltd. commissioned Qingzhou Fangyuan Environmental Impact Assessment Service Co., Ltd. to complete the "Shandong Shengxing Chemical Co., Ltd.'s 1.8 million tons/year hydrocracking project environmental impact report change report", and the 1.8 million The ton/year hydrocracking project is divided into two phases. On November 30, 2015, the Dongying Environmental Protection Bureau issued the "Shandong Shengxing Chemical Co., Ltd. 1.8 million tons/year hydrocracking project environmental impact change report review opinion" and agreed to the project changes.

Shandong Shengxing Chemical Co., Ltd. has obtained the pollution discharge permit issued by Dongying Environmental Protection Bureau on January 1, 2018. The certificate number is 91370523684813343N001P, and the validity period is from January 1, 2018 to December 31, 2020.

The project started construction in December 2016 and was completed in September 2019. The commissioning of the construction project will start and end from September 10, 2019 to December 9, 2019. The completion time of the environmental protection facilities of the project is consistent with the completion time of the project. In September 2019, the company publicized the commissioning of the project's environmental protection facilities on the Shengxing Group website (http://m.shengxingjituan.cn/).

From September 13th to September 14th, 2019, Shandong Huayi Inspection Co., Ltd. conducted on-site monitoring of the wastewater, waste gas, and noise pollution source discharge status of the project and the treatment capacity of various environmental protection facilities. According to the monitoring results and on-site For the environmental management inspection, Shandong Shengxing Chemical Co., Ltd. compiled the environmental protection acceptance monitoring report for the completion of this project.

Publication time of acceptance report: March 27, 2020-April 24, 2020;

Publication content: Completed environmental protection acceptance monitoring report, see attachment for details;

During the publicity period, if you have any objections to the above publicity content, please give feedback in writing. Individuals must sign their real names and units must affix their official seals;

Contact: Li Gong;

Tel: 0546-2953888